Now with the fwd floor assembly behind me, I can start final assembly the fwd fuselage. First order of the day was to install L/G box RH an LH permanently on the fwd floor. I started by final riveting the L/G Box weldment WD822 with the numerous AN470AD4-5 rivets.
Most of the rivets installed easily. I had some issue with a few, considering limited space for bucking bar, and handling the rivet gun at the same time.