Brief Description: Fuselage - FWD Baggage Door Drilling
This Friday was a similar day than Thursday, where I only did a little. I must admit that right now, motivation is not as high as it was before the Holidays. Nothing to do with the RV-8, but more about my general situation being unemployed.
I decided that although I do not need the fwd baggage door done before a long time. might as well work on it right away while it is already put together on cleco. Therefore, on this Friday, I launch myself to drill all the holes in the door parts. Then prior to disassembly the door, I fabricated the hinge and located it in place. Hinge was also drilled. Door was disassembled, then all holes where deburred