KitLog pro

Powered By Kitlog Pro v2.0

Martin's Aircraft Factory RV-8
' style=
Date:  6-6-2016
Number of Hours:  1.00
Manual Reference:  DWG 62
Brief Description:  Fuselage - L/G box weldment riveting

Now with the fwd floor assembly behind me, I can start final assembly the fwd fuselage. First order of the day was to install L/G box RH an LH permanently on the fwd floor. I started by final riveting the L/G Box weldment WD822 with the numerous AN470AD4-5 rivets.

Most of the rivets installed easily. I had some issue with a few, considering limited space for bucking bar, and handling the rivet gun at the same time.

I worked an estimated 1.5 hours riveting
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.