KitLog pro

Powered By Kitlog Pro v2.0

Martin's Aircraft Factory RV-8
' style=
Date:  11-22-2015
Number of Hours:  3.00
Manual Reference:  DWG 62
Brief Description:  Fuselage - L/G box assembly cross braces

For this work session, I did:

- Joined the two L/G box L/H and R/H together with the cross braces F801T-1 and F802N-1.
- Drill full size the matching holes in L/G boxes L/H and R/H with the cross braces F801T-1 and F802N-1
- Disassemble both L/G boxes
- Deburred all holes in L/G boxes
- Scuffed all parts for L/G towers with 3M Scotch Brite

I worked from 15h15 until 18h45
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.