- Joined the two L/G box L/H and R/H together with the cross braces F801T-1 and F802N-1. - Drill full size the matching holes in L/G boxes L/H and R/H with the cross braces F801T-1 and F802N-1 - Disassemble both L/G boxes - Deburred all holes in L/G boxes - Scuffed all parts for L/G towers with 3M Scotch Brite