Got to the hanger at 5:30 this morning and started fitting the right wing. Managed to get it done solo until Chris showed up about 7 am and helped with the bold alignment and left wing. Managed to get all the bolts in before needing to take off. Returned about 2 pm and finished with the torquing of the bolts nuts and washers. connected the fuel lines and ran the wiring through the wings. Maded final connection at the roll servo.