KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  7-6-2013
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Oil cooler & harness

Removed the oil cooler and alodined the aluminum brackets and hose connection. The bolts I had used were a little too long so I used the correct bolts and remounted the cooler. I also sealed the shroud with black RTV. Installed the new oil hoses that Tom at Flightline made for me. Perfect size and length. Also used new steel fittings I had ordered. Moved to the living room and worked on the harness. Soldered up the Can Bus and configured to the right shape.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.