KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  9-16-2012
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Electrical

Added a service loop so i can get the panel loose for service. Installed the forest of tabs ground block on the firewall with the negative bolt through the firewall. Started running some grounds. The flap switch is now wired to the flap motor.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.