KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  9-30-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Canopy fitting

Worked on the canopy frame fit all day. Most builders complain about this part of the build. I figured that it wouldn't be that bad. I figued I would be able to outsmart it. I figured wrong. This thing was a pain in the ass. I believe that by the end of the day I had it close enough. I will check it again tomorrow to make sure I am happy with it. I then drilled and screwed the rear slider track in place to make sure everything was straight. I moved to the next step on the canopy and drew the center line to help find the handle hole location.
' style=





' style=

This canopy is very large and heavy..

This canopy is very large and heavy..

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.