KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  8-6-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Forward fuselage

I pulled the front instrument panel supports apart and deburred, dimpled and added nut plates. These are now set aside until I can alodine them. I don't think I will prome them, just alodine. This area will not see water or much moisture and it will get scracthed badly during panel work so primer doesn't make sense. Started double checking the prints for small things that need to get done before I add the empenage. Drilled, counter sunk and torqued the screws that hold the tank brackets. Then added the last of the bolts that hold the spar carry through together.
' style=

All bare again

All bare again

' style=

Fuel tank bracket support screwed through the skin, longeron and angle with counter sunk screws

Fuel tank bracket support screwed through the skin, longeron and angle with counter sunk screws

' style=

All spar carry thru bolts have been added, torqued and sealed

All spar carry thru bolts have been added, torqued and sealed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.