KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  7-29-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  controls

Finished up all of the forward covers. Alodined, primed and painted. Also cut the elevator push tubes to lengtth and primed inside and out. I ran out of MSK42 rivets but I can install those later. Installed both tubes and the bellcrank. Started on the fuel lines but need to wait until I get a spring bender to get the tough bends.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.