KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  6-24-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuselage assembly prep

Only a couple of hours this morning. Prepped the the bottom forward skin. Deblued, deburred and dimpled. The back side has all the pastic removed. I carefully checked the drawings and dimpled the holes that needed it and to the correct size. Then started on the left side skin. Got one side deburred and plastic removed. Outside I only got the plastic removed on the rivet lines.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.