Powered By Kitlog Pro v2.0
Marks RV-9 build Site
RV-9
Fuselage
5-25-2012
< Previous Log Entry
Next Log Entry >
Date:
5-25-2012
Number of Hours:
2.50
Manual Reference:
Brief Description:
Primed F-711 and started longerons
Primer was dry on the F-711 parts so I riveted them together. Started bending the left longeron and drilling the F-721-B in place.
F-711 assembled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9 Home
Category
# Logs
# Hours
All
415
1537
Assembly
15
90
Avionics
29
104
Electrical
9
32
Empennage
34
130
Engine
18
58
Fuselage
152
529
FWF
23
81
Introduction
1
Miscellaneous
2
Paint
12
136
Shop
2
Tools
3
Wings
115
377
Copyright © 2001-2024 Matronics. All Rights Reserved.