Powered By Kitlog Pro v2.0
Marks RV-9 build Site
RV-9
Empennage
11-13-2011
< Previous Log Entry
Next Log Entry >
Date:
11-13-2011
Number of Hours:
3.00
Manual Reference:
Brief Description:
Fiberglass elevator tips
Finished glassing in aluminum strips for the rivet line. I am not fulling sure that these were necessary but it seems the fiberglass wouldn't be as strong without some backing for the rivets. Final fit the tips, drilled for #30 and clecoed.
Finished adding strips to the rivet line
Clecoed on elevator tips
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9 Home
Category
# Logs
# Hours
All
415
1537
Assembly
15
90
Avionics
29
104
Electrical
9
32
Empennage
34
130
Engine
18
58
Fuselage
152
529
FWF
23
81
Introduction
1
Miscellaneous
2
Paint
12
136
Shop
2
Tools
3
Wings
115
377
Copyright © 2001-2024 Matronics. All Rights Reserved.