KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  10-22-2013
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Cowl painting

Painted the top and bottom cowl with epoxy primer and then the bottom with filler primer. This evening I sanded the lower cowl and then painted with epoxy primer again. Spent some time sanding the upper intersection fairings. Also primed the oil door.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.