KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  10-12-2013
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Wing lights

Wired the strobe/ nav lights along with the Duck works HID leading edge lights. Connected the pitot tubing to the ADHRS. Test ran the motor some more and taxied around.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.