KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  5-8-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Firewall small stuff

Started a few of the small things I need to get done before the engine arrives and gets mounted. Mounted the sensor block. Drilled the firewall for the fuel line and added a doubler and fitting. Drilled for a cushion clamp and riveted a platenut to the back side of the firewall. This clamp is for the oil breather tube. Connected the oil pressure hose to the sensor block.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.