KitLog pro

Powered By Kitlog Pro v2.0

Marks RV-9 build Site
' style=
Date:  10-23-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Canopy and landing gear

Finished disassembly of the canopy and preping the plexi by finish drilling a few holes and counter sinking a few. Then finish drilled the frame, counter sunk the side rails and deburred. I removed most of the plastic. I am not sure if I will remake the rear skirts or try to get a better fit. However I can assemble the rest of the front, top and sides. I need to alodine the pieces for the side and top so I will wait until tomorrow. This left me time to work on the landing gear. Assembled the tire and wheels. Bolted the brake collars on.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.