Painted panel and glare shield dark gray. Glare shield will be covered with material later. I installed rivnuts for 6-32 screws for holding avionics in the panel. Installed windshield with clear sealant and riveted in place. I think that is a mile stone in this build having the windshield in place after all the painting. I will be moving into a hanger the first of Dec at the Arlington airport finally after two year wait. But it is really the right time for the move as I am getting close to putting the wings on and setting up the fuel and controls on the wings. Installed trim spring for elevator.