KitLog pro

Powered By Kitlog Pro v2.0

Rick's RV-7A Web Site
' style=
Date:  4-4-2009
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Began the left elevator understructure preparation

The understructure for the LT elevator was clecoed in the skin and the holes drilled. The left counterweight was also installed.
' style=

Left skin ready to rivet

Left skin ready to rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.