Brief Description: Built the RT elevator understructure.
The understructure of the RT elevator was built with no problem at all. The counterweight was drilled and trimmed. Lead is sure soft. I guess I expected it to be more difficult.
One part to be cautious on are the tabs of the counterbalance rib and the spar/skin interface. They're easily bent.