KitLog pro

Powered By Kitlog Pro v2.0

Rick's RV-7A Web Site
' style=
Date:  8-19-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Redid the Lt main to 6 3/8 and nose to 6.

Enlarged the tow bar openings a bit and filled the old holes. Added more glass to recontour the nose leg fairing over the wheel pant. Installed nut plates on left main gear bracket. Filled all old unused holes and drilled air relief hole in Lt pant.
' style=

Was 3 1/2 inches above the ground.

Was 3 1/2 inches above the ground.

' style=

Now 6 3/8 inches above the ground.

Now 6 3/8 inches above the ground.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.