KitLog pro

Powered By Kitlog Pro v2.0

Rick's RV-7A Web Site
' style=
Date:  7-9-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Trimmed and reinstalled nose gear fairing.

Continued sanding and shaping the wood stiffeners. Temp installed both. Ready for alignment.
' style=

Perfectly level for the alignment.

Perfectly level for the alignment.

' style=

Vernier adjustment (LOL) tool for the lift.

Vernier adjustment (LOL) tool for the lift.

' style=

Getting ready, in the air, strings on,  tape measures everywhere. Thanks Harbor Freight.

Getting ready, in the air, strings on, tape measures everywhere. Thanks Harbor Freight.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.