Brief Description: Finish rivet of bottom side of port stabilizer
Flipped the stabilizer assembly over and finished the starboard side. No drill outs this time and we cut the time down to just 45 minutes.
Tommorow we will finish the port horizontal stabilizer.
I will need to schedule a visit with Bobbi, an RV-4 builder/flyer. She holds about a dozen FAA certificates, both flight and aircraft mechanic versions and has graciously agreed to check my work over. I need to have this done prior to riveting the rear spar in place. At that point we will not have access to the front spar rivets for a QA check.