Clecoed skin after all deburring completed and installled CCP 42 blind rivets as per drawing. Found a couple of bad rivets as received from the factory.Need to look closely at each rivet before installing.
Putting skin back on the frame
Completed horizontal tail
Had moving blanket on riveting table to minimize scratching