KitLog pro

Powered By Kitlog Pro v2.0

Lorens Web Site
' style=
Date:  12-20-2012
Number of Hours:  40.00
Manual Reference:  ONX-D01
Brief Description:  Final touches on canopy.

Took a lot of time to fit the canopy and so far it has been the most difficult and time consuming operation of the entire building process.

Plans called for a metal drawer handle to be used in the canopy locking bar. I used a 4 1/2 in rope cleat that was purchased at the local hardware store instead as I wanted something that was a little more robust. and I think it looks beter too.

I also posted a couple of videos on Youtube showing how I cut the canopy.

http://www.youtube.com/watch?v=wD7qjg23v5Q
http://www.youtube.com/watch?v=EVTdUUCPQA0
' style=

Made final trims and adjustments to canopy

Made final trims and adjustments to canopy

' style=




' style=

4 1/2 inch rope cleat on canopy locking bar.

4 1/2 inch rope cleat on canopy locking bar.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.