KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  3-18-2017
Number of Hours:  8.00
Manual Reference:  
Brief Description:  LG tower screws, fwd baggage riveting, and started

Painted and baked the 807 and 808 bulkheads, the bulkhead gussets, the canopy rail receptical and the forward avionics bay acces door hinge.

Installed the remaining rivets, screws, washers and nuts through the forward skins and into the landing gear tower except for two holes on each side which will get drilled out for bolts to attach the wing attach angles to two screws on each side that will be installed after the landing hear bolts are installed. Applied torque strip paint to the nuts.

Riveted the forward baggage compartment bulkheads to the cross rail and forward side skins.

Fabricated a retainer clip for the forward avionics bay access door hinge pin and installed a nut plate to fasten the hinge pin retainer clip to.

Begain clecoing together the components for the instrument panel
' style=

LG tower screws installed

LG tower screws installed

' style=

Forward avionics bay access door hinge pin retainer

Forward avionics bay access door hinge pin retainer

' style=

The start of the instrument panel prep work

The start of the instrument panel prep work

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.