Brief Description: LG tower screws, fwd baggage riveting, and started
Painted and baked the 807 and 808 bulkheads, the bulkhead gussets, the canopy rail receptical and the forward avionics bay acces door hinge.
Installed the remaining rivets, screws, washers and nuts through the forward skins and into the landing gear tower except for two holes on each side which will get drilled out for bolts to attach the wing attach angles to two screws on each side that will be installed after the landing hear bolts are installed. Applied torque strip paint to the nuts.
Riveted the forward baggage compartment bulkheads to the cross rail and forward side skins.
Fabricated a retainer clip for the forward avionics bay access door hinge pin and installed a nut plate to fasten the hinge pin retainer clip to.
Begain clecoing together the components for the instrument panel
LG tower screws installed
Forward avionics bay access door hinge pin retainer