Powered By Kitlog Pro v2.0
N983LK
RV-8
Fuselage
2-9-2017
< Previous Log Entry
Next Log Entry >
Date:
2-9-2017
Number of Hours:
2.00
Manual Reference:
Brief Description:
Control rods continued
Completed priming the elevator control rods.
Threaded the rod ends on the elevator control rods and adjusted the rod lengths per the plans.
Filed the bushing for the aft pilots stick to fit the control column.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.