KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  9-4-2016
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Fuel tubing

Made numerous attempts a fabricating the filter-to-fuel valve tube. No success. Mostly made scrap

UPDATE; In 2020 I ended up replacing these fuel lines with premade braided lines from TS Flight Lines.
' style=

Pile of rejected fuel tubes

Pile of rejected fuel tubes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.