Back riveted the avionics access door doubler to the upper baggage bulkhead. Back riveted the access door hinge to the access door. Clecoed the access door and hinge assembly to the upper baggage bulkhead and back drilled the door to match the holes in the bulkhead and doubler. Riveted the nut plates to the upper baggage door bulkhead.
Cut a notch into the access door to clear the baggage door brace.
Added two additional nut plates to the avionics access door to get a tighter fit.
Scuffed, cleaned and primed the lower baggage bulkhead, forward baggage compartment side
Back riveted the stiffeners and inboard attach angle to the forward baggage compartment floor.
Avionics access door in place on upper baggage bulkhead
Aft side of upper baggage bulkhead with doubler riveted in place