KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  10-30-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fuselage Roll Out

The fuselage "saw the light of day" for the first time. Well. it's seen plenty of day light but today I rolled it out to the driveway for the first time. I did it to check the GPS satellite reception (which was fine) and to turn it 180 degrees in the shop with the firewall facing the garage doors to make it easier to hang the engine

Rolled the fuselage back into the shop and reconfigured the shop a bit in preparation for hanging the engine
' style=





' style=




' style=

Good satellite reception

Good satellite reception

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.