KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  11-11-2015
Number of Hours:  3.50
Manual Reference:  
Brief Description:  More pitot tube and wiring routing

Finished the pitot/AOA tube wiring and tubing support angle. Primed and installed nutplates. Drilled mounting holes in rib for support angle

Drilled holes in the tubing support bracket that bolts on with the bellcrank bracket bolts. One of the holes is for an Adel clamp to support the wiring from the pitot heat controller and the other is for a snap bushing through which the pitot heat wire harness from the fuselage will run.

Installed braided sleeving on the wire harness from the controller to the connectors for the pitot
' style=

Tubing and wire harness support bracket

Tubing and wire harness support bracket

' style=

Added holes to tubing/wire support bracket on bellcrank

Added holes to tubing/wire support bracket on bellcrank

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.