KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  8-14-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  OB LH LE Rib riveting and aileron bracket prep

Used the hand manual hand squeezer to install the five rivets that connect the outer most ribs (both LE and AFT) to the spar.

Preassembled the aileron brackets. Edge deburred, match drilled and hole deburred. Got a little slopping with the drilling (with a reamer) hand opened up on of the holes in the RH OB bracket. Will probably buy replacements.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.