KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  3-28-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  RH LE langing light cut out

Used a laser level to double check the marked location of the cutout for the Duckworks landing light in the RH leading edge. When I was satisfied with the location I drilled holes in each of the corners with the unibit and then used a dremel tool to cut the opening within ~1/4 of the final size followed but a 1/2" sanding drum to sand it to final size
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.