KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  1-25-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Deburred rib flange holes and drilled holes for wi

Disassembled RH wing aft section assembly and deburred holes in forward and aft flanges of LH and RH aft ribs. Laid out and drilled ¾” holes for corrugated conduit which will be used for wire routing in LH and RH ribs. Opened up the tooling holes behind the forward flanges of inboard LH ribs to 7/16”. These holes will be used for routing the tubing for pitot static and AOA tubing.
' style=

Drilling hole in a rib for corrigated conduit

Drilling hole in a rib for corrigated conduit

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.