KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  10-31-2021
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Prep for fuel flow tests

Removed the cowl and forward baggage shelf. Tighted the fuel lines between the LH gear tower and the fire wall. Fabricated an aluminum tube to connect to the engine side of the firewall fuel fitting for use in testing the boost pump.

Removed the wheel pants and upper instersection fairings.
' style=

Aluminum tube for use in testing boost pump

Aluminum tube for use in testing boost pump

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.