Powered By Kitlog Pro v2.0
N983LK
RV-8
All
10-26-2021
< Previous Log Entry
Next Log Entry >
Date:
10-26-2021
Number of Hours:
2.00
Manual Reference:
Brief Description:
Upper intersection fairings continued
Removed the RH upper intersection fairing and trimmed and sanded the plies that were laid up yesterday
Installed a nut plate in the side of the fuselage to hold the upper flange of the RH fairing.
Reinstalled the RH fairing and laid up two plies to fill in the area around the forward outboard landing gear bolt.
Sanded the epoxy/ flox on the aft edge of the RH wing tip. Laid up some more epoxy/flox on the inner inboard edge of the trailing edge.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.