KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  9-27-2021
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Forward fuselage floor

Attached the adle clamp to the replacement click stud on the fuselage floor.

Installed the forward floor

Torqued and torque stripped the fuel lines connectors at the fuel tanks.

Torqued and torque stripped the fuel vent line connectors at the fuel tank and fuselage side
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.