KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  7-31-2021
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Final install of empenage on fuselage part 1

Wet sanded and painted the horizontal stabilizer tips

Installed the com 2 antenna

Tested the radios. There’s a squeal when transmitting on com 1 which will need some troubleshooting.

Bolted the horizontal stab to the fuselage. Torqued and torque striped the bolts

Drilled a 1/4 hole in the inboard rib of the LH horizontal stab. Installed a snap bushing
.
Routed the pitch trim wire through the snap bushing just installed and the snap bushing in the aft spar on the LH side of the horizontal stab.

Installed an Adel clamp to the fuselage aft deck to secure the pitch trim wire
' style=

Comm antennas in place

Comm antennas in place

' style=

Horizontal Stab bolted on

Horizontal Stab bolted on

' style=

Pitch trim wire routing the HS

Pitch trim wire routing the HS

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.