KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  7-27-2021
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Empenage tips

Wet sanded the spot putty on the elevator tips. Sprayed with filler primer.

Layed up two plies of fiberglass/epoxy on the plywood closeout on the aft edge of the vertical stabilizer tip cap.
' style=

Elevator tip

Elevator tip

' style=

Glass layup on VS tip cap

Glass layup on VS tip cap

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.