Powered By Kitlog Pro v2.0
N983LK
RV-8
All
7-25-2021
< Previous Log Entry
Next Log Entry >
Date:
7-25-2021
Number of Hours:
4.50
Manual Reference:
Brief Description:
More empenage work and misc
Sanded the micro on the bottom of the tip caps on the horizontal stabilizer. Applied superfill to the pin holes.
Removed the vertical stabilizer so I can take it home and lay up some plies over the tip cap close out.
Filed the canopy latch to reduce the force it takes to close it
Removed the cowl and replaced one of the spade connectors on the #4 CHT wire that had been installed incorrectly and was causing intermittent readings
Sanded the superfill on the HS tips. Applied spot putty
Spot putty on the horizontal stab tip cap
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.