KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  7-17-2021
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Wheel fairings part 23

Sanded the epoxy/micro on the wheel fairing assemblies with 80 grit. Installed the wheel fairings on the aircraft to double check the fit.

Cleaned up the shop and started loading up the cargo trailer with workbenches, tools, supplies etc for the move to the hangar
' style=

Epoxy/micro sanded

Epoxy/micro sanded

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.