Powered By Kitlog Pro v2.0
N983LK
RV-8
All
11-12-2020
< Previous Log Entry
Next Log Entry >
Date:
11-12-2020
Number of Hours:
2.50
Manual Reference:
Brief Description:
Wheel fairings part 4
Trimmed the RH wheel fairing halves, drilled #40 holes in the nutplate locations. Trimmed the aft half for clearance from the RH gear leg. Lined up the aft half on the wheel. Aligned with the laser. Clamped the fairing half in place
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.