KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  8-11-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Prep for windscreen fairing layup

Sanded the Superfill on the aft end of the canopy skirt. Applied spot putty over the unprimed areas of the aft end of the canopy skirt. When it dried I sanded it and sprayed high build primer over it.

Sanded the high build primer once it dried and applied some spot putty to the OML of the tunnel on the aft end of the skirt. When that dried I sanded it and then sprayed a coat of high build primer on the unprimed areas of the aft end of the skirt

Applied electrical tape over the trim tape on the forward top skin and windscreen.

Sanded the areas of the windscreen and forward top skin there the fairing will be with 60 grit

Sprayed sandable primer on the un-primed wing tip.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.