KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  7-22-2020
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Throttle quadrant

Adjusted the cables for throttle, mixture and prop at the throttle quadrant to allow the levers to go as far forward as possible.

Opened up the three holes in the aft bulkhead of the LH landing gear tower to allow the control cables to fit in them (this took way too long).

Installed the throttle quadrant. Cut snap bushings to slip over the control cables and inserted them into the holes in the forward bulkhead of the LH landing gear tower.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.