Brief Description: Engine linkages at throttle quadrant
Wet sanded the spot putty on the wing tips and applied a layer of high build primer to each of them
Removed the panel mounted avionics and and the panel in preparation for installing the landing gear and riveting on the forward top skin
Hooked up the engine control linkages to the throttle quadrant. I centered the adjustments on the mounting nuts and the clevises, but the throws of the throttle, mixture and prop are all off. The cables hit their forward limits when the control levers are only about 3/4 of the way forward. I'll need to adjust this.