KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  7-16-2020
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Primered landing gear and misc rudder pedal work

Solvent wiped the landing gear legs and sprayed a coat of Spray Max Epoxy primer in the inboard surfaces of both legs

Sanded the micro on the wing tips and applied neat epoxy pin hole filler using a 1" diameter paint roller. This method worked better than the squeegee method because it left a more uniform epoxy coating. Applied a second and third coat after each of the previous coats gelled.

Sprayed primer on the outboard surfaces of the landing gear legs

Removed the brake pedal assembly. Fabricated and installed a new lock pin for the brake pedal position adjustment (the old one was shorter than spec). Installed both brake fluid reservoirs on the master cylinders
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.