KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  10-26-2020
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Landing gear fit up

Removed the landing gear legs and outboard U-brackets. Sanded/filed the U-brackets down to achieve the .030" minimum clearance between the U-brackets and the wearplates.

Installed the 90° brake fittings in the landing gear legs.

Reinstalled the landing gear legs and torqued the nuts on the outboard U-brackets
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.