KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  5-12-2019
Number of Hours:  4.00
Manual Reference:  
Brief Description:  More interior painting and ram mount base installa

Painted the sides of the rear baggage compartment floor with machine gray paint. The bottom will be painted with the truck bed paint.

Installed -3 nut plates on the RH mid-fuselage forward bulkhead hold a RAM mount ball base for the iPAD RAM mount

Painted the part of the baggage door support strips that will be exposed when the door is open
' style=

Baking the paint on the sides of the rear baggage floor

Baking the paint on the sides of the rear baggage floor

' style=

Ipad RAM Mount ball base

Ipad RAM Mount ball base

' style=

Ipad mounted

Ipad mounted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.