Date:  2-17-2019
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Misc tasks

Painted final coat on roll bar

Riveted the sub-panel to the fuselage and installed the remaining rivets at the top of the sub-panel frame

Spliced the power wire for the SV-EMS warning light into the stall warning power wire

Primed the landing gear tower access panels.
' style=

Painted rollbar and primered panel

Painted rollbar and primered panel