KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  7-5-2018
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Wiring

Wiring work. Cut and terminated all but two of the wires for the autopilot panel with D-sub sockets and plugged them into the D-sub connector. The remaining two wires are for the roll trim servo which route through the LH gear tower. Those two will be routed after I work out the harness routing from the LH gear tower. Hooking up the pitch servo involved installing a solder sleeve with pigtail on the five conductor wire and soldering an extension wire to the pigtail to route it to the grounding block.

Connected the power wire to for the ELT to the VP-X and installed a solder sleeve pigtail ground wire on the ELT three conductor wire.

Hooked up a few other power wires and solder sliced some more ground wires.

Installed the Garmin G5 in the panel
' style=

Autopilot wiring

Autopilot wiring

' style=

Garmin G5 installed

Garmin G5 installed

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.